Liberte
Management of internal waste | Sustainable transportation | Eco-packaging | Energy efficiency
 

Energy efficiency

 
2008

Energy efficiency study with the help of an external consultant.

Aim of the study at our production facility:

  • Reduce overall plant energy consumption by 20% to 35%
  • Measure production-related energy needs
  • Measure energy needs related to heating the building
  • Develop an automated energy management control system
  • Evaluate the potential for energy recovery
  • Optimize compressed air networks

Installation of a water tower
to cool used water.

Construction of a new energy-efficient distribution centre and head office at Saint-Hubert, Quebec:

  • Recovery of heat released by our products arriving from the plant, which are cooled in a recovered-energy refrigerator, contributing to the heating of offices in the building
  • Use of cold outside air in winter months (December to March) to refrigerate products
  • Installation of more efficient lighting
  • Installation of Energy Star electrical appliances in Liberté staff kitchen